The team consists of six members –professor Dr.Sc., two assoc. professors, chief assistant, assistant and a PhD student. The main fields of competence of the team are:

Design of specialized software in the field of electric power engineering;
Calculation and analysis of:
  • steady states: voltage levels; advisable tap positions of network transformers; power and energy loss in transmission and distribution networks; advisable reactive power compensation;
  • emergency states: short circuits;interruption of phase lines; complex complex types of faults, including in wind and photovoltaic power plants;
  • optimal settings of AVR and PSS;
  • small-signal stability of electric power systems;
  • transient stability of electric power systems;
  • robust stability of electric power systems;
Preproject study and design of:
  • underground and overhead lines up to 400 kV;
  • transformer substations up to 400 kV.
Consultations and trainings in the field of electric power engineering.
Electric Power Systems1
Electric Power Systems2
Electric Power Systems3

Some of the more important projects the team has worked on are:

  • Improvement of the frequency control of the Turkish Electric Power System for synchronous operation with UCTE –contractor ESO EAD
  • Analysis of the small-signal stability of the new and old part of NPP „Kozloduy” – contractor NPP „Kozloduy”
  • Analysis of the power system stabilizers PSS-2A in AES-3C Maritza Iztok 1 EOOD power plant by a detailed mathematical model and proposal of new settings which will damp better the electromechanical oscillations in the generators – contractor AES-3C Maritza Iztok 1 EOOD
  • Development of scientific methodology and software tool for determination of the appropriate settings of Automatic Voltage Regulators (AVR) and Power System Stabilizers (PSS), installed in Bulgarian power plants – contractor NEK EAD
  • Functionality extension of the software tool NASAVR for calculation of the parameters of AVR and PSS – contractor NEK EAD
  • Training of dispatchers from the National and the Territorial Dispatching Centers on the subject „Modern methods for modeling and analysis of electrical power systems transient processes in MATLAB environment“ – contractor ESO EAD
  • Representation of wind farm „Sveti Nikola”as equivalent synchronous generator for the purposes of calculation of short circuits contractor AES GeoEnergy EOOD
  • Representation of wind farm „Vetrokom”as equivalent synchronous generator for the purposes of calculation of short circuits
  • Representation of PV farm „Samovodene”as equivalent synchronous generator for the purposes of calculation of short circuits
  • Analysis of the operating states of the 110 kV network, owned by Mini Maritsa Iztok EAD, and of the supplying generators under conditions of compensation of reactive power – contractor Mini Maritza Iztok EAD
  • Study and analysis of the problem with increased reactive power of TRLK Vyrbitza after the change of the commercial metering point and proposition of measures for overcoming the problem – contractor Bulgarian Air Traffic Services Authority
  • Analysis of the conditions for automatic power supply backup of substation 223 ­– contractor Neftohim AD
  • Analysis of the MV distribution network of NEK EAD, Dobrich region – contractor NEK EAD
  • Forecasting and planning of electricity losses in low voltage distribution networks – contractor Energoproekt
  • Temporary scheme for power supply of the consumers "Airport Radar", "Condition Main Hall", "Main Control Room" and "Boilers" from 20 kV network and diesel-generator C 1250 – contractor Bulgarian Air Traffic Services Authority
  • Calculation of the overvoltage levels and currents for short circuits to ground in substations „Staro Orqhovo” and „Dolen Chiflik” – contractor NEK EAD
  • Calculations of short circuits to ground in cable MV distribution network in substation “Shumen-1” and consultations on the methodology of calculation – contractor NEK EAD
  • Preparation of expert assessment the state and allowable operating conditions of diesel-generator C 1250 – contractor Bulgarian Air Traffic Services Authority
  • Software for automated design of the mechanical part of 20 kV overhead lines – contractor NEK EAD
  • Development of a software tool for grid code compliance verification of electric power plants – contractor Siemens SI DG PTI
  • Development of a software tool for subsynchronous resonance analysis in electric power systems – contractor Siemens SI DG PTI
  • Development of a software tool for power system stabilizer PSS tuning – contractor Siemens SI DG PTI
  • Development of a software tool for power system stabilizer PSS tuning – contractor General Electric